Description
Technical Parameters
1. Preparation work
Before installing the Great Wall board, you need to do the preparation work first. Specifically, it includes cleaning the wall, measuring the size of the board, preparing the tools required for assembly (such as electric drills, screwdrivers, saws, etc.).
2. Installation of the external corner
The external corner is mainly installed at the position of the internal corner to protect the wall corner. Before installing the external corner, you need to saw the external corner into a suitable length, and then fix it with screws at the external corner position. Pay attention to the vertical angle when fixing.
3. Installation of upper and lower water inlets
The upper and lower water inlets need to be installed near the wash basin, washing machine and other home appliances on the wall. When installing, first insert the upper and lower water inlets into the wall, and then fix them with fixing screws.
4. Installation of skirting board
The skirting board is mainly used to protect the ground. When fixing, place the skirting board on the ground, with the top in contact with the wall, and fix it to the wall with wooden nails.
5. Installation of the board
Fix the Great Wall board vertically on the wall, insert the screws into the wall, and fix it with the Great Wall board. When fixing, pay attention to the vertical and horizontal splicing gaps.

For more details,Please contact Lilian(WhatsApp):+8615206832922
Hot Tags: 195*12mm fluted wall panel, China 195*12mm fluted wall panel manufacturers, suppliers, factory, Wood Plastic Composite Wall Panel, WPC Board For Wall, Wood Plastic Composite Panel, Integrated Wall Panel, PVC Marble Wall Sheet, Interior Uv Coating PVC Marble Sheet
Next
Wpc Fluted PanelSend Inquiry